a150408a5a
CI / check (push) Has been cancelled
(Set up Serena IDE integration with a Nix language server and create a memory graph documenting package conventions, core structure, tech stack, and task completion workflows.)
12 lines
853 B
Markdown
12 lines
853 B
Markdown
# nix-overlay — task completion
|
|
|
|
Done when ALL of these pass/hold:
|
|
|
|
1. Build passes: `nix build .#<package>` (or `nix flake check` for cross-cutting changes). Never leave a package committed that doesn't build.
|
|
2. Formatting: `nix fmt` clean (nixfmt; `flake.lock` excluded).
|
|
3. New package is staged (`git add packages/<name>/`) before build — blueprint index requirement.
|
|
4. README.md Available Packages table updated if package added/changed visibly.
|
|
5. Commit: conventional commit format (use conventional-commit / caveman-commit skill). No work left uncommitted.
|
|
6. Beads: work claimed via `bd update <id> --claim` before, `bd close <id>` after.
|
|
7. Pushed: `git pull --rebase && bd dolt push && git push` then `git status` shows "up to date with origin". `bd dolt push` skip message is expected, not a failure. Do not stop before push succeeds.
|