a150408a5a
CI / check (push) Has been cancelled
(Set up Serena IDE integration with a Nix language server and create a memory graph documenting package conventions, core structure, tech stack, and task completion workflows.)
853 B
853 B
nix-overlay — task completion
Done when ALL of these pass/hold:
- Build passes:
nix build .#<package>(ornix flake checkfor cross-cutting changes). Never leave a package committed that doesn't build. - Formatting:
nix fmtclean (nixfmt;flake.lockexcluded). - New package is staged (
git add packages/<name>/) before build — blueprint index requirement. - README.md Available Packages table updated if package added/changed visibly.
- Commit: conventional commit format (use conventional-commit / caveman-commit skill). No work left uncommitted.
- Beads: work claimed via
bd update <id> --claimbefore,bd close <id>after. - Pushed:
git pull --rebase && bd dolt push && git pushthengit statusshows "up to date with origin".bd dolt pushskip message is expected, not a failure. Do not stop before push succeeds.